 | Step 1: Receiving - Disassemble parts to simplest form
- Visually inspect to ensure suitability for coating
- Enter parts into system
- Assign production routing control
|  |
Step 2: Part preparation - De-grease/de-gas to remove organic contaminants
- Media blast to NACE #1/SSPC-SP5 white metal specification
- Visually inspect and perform profile test
|  |
Step 3: Coating - Inspect surface
- Jig and mask as required
- Clean with dry compressed air
- Apply coating
|  |
Step 4: Curing - Set oven parameters
- Monitor cure time and temperature electronically
|  |
Step 5: Q & A - Visually inspect 100% of coated area for coverage and uniformity
- Check cure
- Perform thickness tests
- Check fit (as required)
|  |